{"lang":"en","ask":{"ui":{"company":"Tamarugo Coatings","logo":"TC","kind":"Industrial paint manufacturer · 1 plant, 4 work centers","fict":"Fictitious company","greet":"I hold the full model of Tamarugo Coatings: inventory, production orders and routings, purchasing, sales, team timesheets, email and meetings. Ask me what an owner would ask.","placeholder":"Type your order or question…","send":"Ask","suggest":"Try","more":"More questions","thinking":"Reviewing the business model","hits":"matches","read":"records reviewed","cited":"sources cited","memTitle":"Company model","memSub":"Everything connected in one living system","viewerHint":"Tap a source in the answer and the exact record opens here, with the figure the answer came from.","back":"Model","source":"Source","mapped":"In this demo I answer questions about the sample company. The closest one to yours is:","mappedShort":"That question isn’t in this demo, so I answered the closest one about the sample company. With your company, I answer from your own data.","autoBadge":"Automatic demo · tap an order to try it yourself","note":"Sample company. With yours, it comes from your data: your ERP, spreadsheets, email and systems. Nothing goes out without a person’s approval.","pending":"Pending approval","draftOf":"Draft prepared by Poesi","noReply":"No reply","you":"You"},"mem":[{"k":"stock","n":"186,400","l":"stock moves"},{"k":"prod","n":"3,920","l":"production orders and routings"},{"k":"po","n":"2,610","l":"purchase orders"},{"k":"so","n":"11,480","l":"sales orders"},{"k":"time","n":"24,300","l":"team timesheets"},{"k":"mail","n":"21,700","l":"emails, chats and meetings"}],"qs":[{"id":"obso","chip":"Which stock is obsolete, and how much cash is tied up?","q":"Which stock is obsolete or at risk, and how much capital is tied up in it?","kw":["obsole","stock","inventory","capital","tied","expir","slow","dead","overstock","warehouse","turnover","cash"],"scan":{"stock":18640,"so":4210,"prod":380,"mail":46},"a":[{"p":"There is $214K in inventory. $61K (29%) hasn’t moved in over 180 days or will expire before it can be sold at the current pace:","src":["stock_antig"]},{"li":"<b>$27K in a raw material for a discontinued formula</b>. Resin RA-40 was bought for the EP-300 enamel, which left the catalog in May. 9,800 kg remain, unused.","src":["stock_ra40","mail_ep300"]},{"li":"<b>$19K in finished goods about to expire</b>. 1,140 pails of LT-20 latex expire in January; at the last 3 months’ pace, about 380 will sell.","src":["stock_lt20","ventas_lt20"]},{"li":"<b>$15K in custom colors nobody picked up</b>. 46 batches made for 9 customers, sitting in the warehouse for over 120 days.","src":["stock_pedido"]},{"p":"There is a way out: the lab already tested RA-40 in the PB-10 primer and it works, but nobody changed the formula in the system.","src":["meet_lab"]}],"act":{"t":"Draft plan to free up capital: reformulate PB-10 with RA-40, offer LT-20 to 2 distributors and notify the 9 customers with batches still waiting.","who":"Operations manager","doc":"draft_obso","btn":"See plan"}},{"id":"restr","chip":"Where is the bottleneck this week?","q":"Where is the constraint this week, and which order mix should we prioritize?","kw":["bottleneck","constraint","capacity","throughput","line","produc","priorit","mix","queue","machine","schedul","plant"],"scan":{"prod":412,"time":1260,"so":188,"stock":940},"a":[{"p":"The constraint is the <b>line 2 disperser</b>: this week it has 61 hours of orders against 48 hours available. Every other work center is below 75% load.","src":["carga_centros"]},{"li":"<b>The product that fools you</b>: PU-80 polyurethane has the highest margin (42%), but takes 80 disperser minutes per 100 liters. Per constraint hour it brings in $186; AC-15 anticorrosive brings in $412.","src":["margen_hora","ruta_pu80"]},{"li":"<b>Three committed orders will be late</b>. OP-2291, OP-2294 and OP-2302 are queued behind 28 hours of PU-80.","src":["op_cola"]},{"li":"<b>The disperser loses 6.5 hours a week to cleaning</b>, mostly when switching from dark to light colors.","src":["partes_disp"]},{"p":"Proposal: schedule light to dark, protect the bottleneck with a 4-hour reserve of ready work, and move the PU-80 batch the customer needs on Nov 28 to week 47.","src":["ov_pu80"]}],"act":{"t":"Draft disperser sequence: the 3 committed orders are back on time. The plant manager approves it before the shift.","who":"Plant manager","doc":"draft_secuencia","btn":"See sequence"}},{"id":"repo","chip":"What do we need to replenish today?","q":"What should we replenish today based on real consumption, without stock-outs or overstock?","kw":["replenish","buy","purchas","stock-out","stockout","supply","consumption","buffer","minimum","supplier","order","short","raw"],"scan":{"stock":6420,"po":214,"prod":96,"mail":38},"a":[{"p":"Out of 612 raw materials and packaging items, 7 entered the red zone of their safety stock today. We replenish what was consumed, not what a forecast said:","src":["buffers"]},{"li":"<b>Titanium dioxide</b>: 10 days of consumption left and the supplier takes 12. It feeds the constraint. Order 8,400 kg today, what was used in the last 3 weeks, with an expedited partial delivery.","src":["oc_tio2"]},{"li":"<b>20 L pails</b>: the supplier will deliver on Monday the 17th if the order is confirmed before Thursday.","src":["mail_envases"]},{"li":"<b>What not to buy</b>: 3 open solvent orders worth $22K, created by the monthly plan, and all three are in the green zone.","src":["oc_abiertas"]},{"p":"That way no input to the constraint stays in the red, and $22K of purchases that aren’t needed today can wait."}],"act":{"t":"7 draft purchase orders based on real consumption, and 3 solvent orders proposed for postponement. The purchasing manager approves them.","who":"Purchasing manager","doc":"draft_oc","btn":"See orders"}},{"id":"equipo","chip":"What is late, and who is overloaded?","q":"Which orders are late, who is overloaded, and what should the supervisor look at today?","kw":["late","team","supervis","overload","load","task","shift","people","who","hours","delay","pending","staff"],"scan":{"time":1840,"prod":233,"so":96,"mail":54},"a":[{"p":"11 production orders are late, and 4 of them account for 80% of the late liters. The problem isn’t the people: it’s how the work is distributed.","src":["op_atrasadas"]},{"li":"<b>Quality control is a hidden bottleneck</b>: the afternoon shift has a single analyst. 14 batches are waiting for release, with an average wait of over 2 days.","src":["partes_cc","cola_cc"]},{"li":"<b>The night shift works 11 hours of overtime a week in filling</b> to catch up on what falls behind during the day. Five weeks in a row.","src":["partes_env"]},{"li":"<b>Two customer commitments have no owner</b>: a quality certificate requested by email and a color sample requested on WhatsApp.","src":["mail_cert","wa_muestra"]},{"p":"Today the supervisor should look at three things: release the constraint’s batches first, add quality capacity to the afternoon shift, and assign the two orphan commitments."}],"act":{"t":"Draft plan of the day for the supervisor: release priorities, a proposed shift change and 2 tasks assigned. The supervisor decides.","who":"Plant supervisor","doc":"draft_sup","btn":"See plan of the day"}}],"docs":{"stock_antig":{"k":"stock","chip":"Inventory aging","title":"Inventory by age","meta":"As of Nov 10 · valued at cost","cols":["Bucket","Value","%"],"rows":[["0 to 90 days","$118,000","55%"],["91 to 180 days","$35,000","16%"],["==Over 180 days or expires before it sells==","==$61,000==","==29%=="]],"foot":"Total inventory: $214,000"},"stock_ra40":{"k":"stock","chip":"Stock · resin RA-40","title":"Alkyd resin RA-40","meta":"Stock moves · last 12 months","cols":["Date","Move","Kg"],"rows":[["Feb 14","Receipt PO-6120","+12,000"],["Mar to Apr","Consumed in EP-300","−2,200"],["==May to Nov==","==No consumption==","==0=="]],"foot":"==Balance: 9,800 kg · $27,400 at cost=="},"mail_ep300":{"k":"mail","chip":"Email · EP-300 discontinued · Apr","title":"EP-300 enamel leaves the catalog","meta":"Email · Apr 8, 2026 · 10:12","from":"Sales management","to":"Operations · Purchasing","body":["Team,","==From May, EP-300 enamel is discontinued==; PU-80 replaces it.","Purchasing: please don’t replenish inputs used only in EP-300.","Regards,<br>Sales management"],"flag":"Resin RA-40 had already been bought"},"stock_lt20":{"k":"stock","chip":"Batches · LT-20 latex","title":"LT-20 latex · 20 L pail","meta":"Batches in stock as of Nov 10","cols":["Batch","Pails","Expires"],"rows":[["L-2611","420","==Jan 12=="],["L-2618","380","==Jan 19=="],["L-2633","340","==Jan 26=="]],"foot":"1,140 pails · $19,200 at cost"},"ventas_lt20":{"k":"so","chip":"Sales · LT-20 · 3 months","title":"Sales orders · LT-20","meta":"August to October","cols":["Month","Pails sold"],"rows":[["August","131"],["September","122"],["October","127"]],"foot":"==380 pails in 3 months: at this pace, about 760 won’t sell before they expire=="},"stock_pedido":{"k":"stock","chip":"Custom colors not picked up","title":"Made-to-order stock not picked up","meta":"Over 120 days in the warehouse","cols":["Customer","Batches","Value"],"rows":[["Contractor · north","12","$4,100"],["Distributor · south","9","$3,300"],["7 other customers","25","$7,600"]],"foot":"==46 batches · 9 customers · $15,000=="},"meet_lab":{"k":"meet","chip":"Lab committee · Sep","title":"Lab committee","meta":"Meeting · Sep 18 · 35 min · transcribed","lines":[["Lab manager","12:40","We tested RA-40 in the PB-10 primer. ==It passes every test replacing up to 30% of the current resin.=="],["Operations manager","13:05","So why aren’t we using it?"],["Lab manager","13:12","Someone still has to change the formula in the system."]]},"draft_obso":{"k":"draft","chip":"Plan · free up capital","title":"Plan to free up capital in inventory","meta":"Draft","to":"Operations management","body":["<b>Goal</b>: free up part of the $61K tied up.","1. Change the PB-10 bill of materials to use 30% RA-40, per the lab test.","2. Offer LT-20 to the 2 distributors who buy it most, with volume pricing before December.","3. Notify the 9 customers with batches waiting and propose a shipping or invoicing date.","==No formula changes and nothing goes to customers without your approval.=="],"who":"Operations manager"},"carga_centros":{"k":"prod","chip":"Load by work center · week 46","title":"Load and capacity by work center","meta":"Week 46 · released orders","cols":["Work center","Load","Available","Use"],"rows":[["Weighing","31 h","48 h","65%"],["==Line 2 disperser==","==61 h==","==48 h==","==127%=="],["Mill","34 h","48 h","71%"],["Filling","70 h","96 h","73%"]],"foot":"The constraint sets the pace for the whole plant"},"margen_hora":{"k":"prod","chip":"Margin per bottleneck hour","title":"Margin per disperser hour","meta":"Price minus materials, from current routings and bills of materials","cols":["Product","Margin","Disperser min per 100 L","Per constraint hour"],"rows":[["==PU-80 polyurethane==","==42%==","==80==","==$186=="],["AC-15 anticorrosive","31%","24","$412.50"],["ES-30 synthetic enamel","28%","20","$360"]],"foot":"The one that earns most per liter earns least per constraint hour"},"ruta_pu80":{"k":"prod","chip":"Routing · PU-80","title":"Manufacturing routing · PU-80","meta":"Standard 1,000 L batch","cols":["Operation","Work center","Minutes"],"rows":[["Weighing","Weighing","45"],["==High-speed dispersion==","==Line 2 disperser==","==800=="],["Color matching","Lab","60"],["Filling","Filling","90"]],"foot":"A single operation takes up the scarcest resource"},"op_cola":{"k":"prod","chip":"Disperser queue","title":"Orders queued · line 2 disperser","meta":"Current sequence · Monday Nov 10","cols":["Order","Product","Hours","Due"],"rows":[["OP-2287","PU-80 · 1,200 L","16","No date"],["OP-2288","PU-80 · 900 L","12","Nov 28"],["==OP-2291==","==AC-15 · 1,750 L==","==7==","==Nov 13=="],["==OP-2294==","==ES-30 · 1,500 L==","==5==","==Nov 13=="],["==OP-2302==","==AC-15 · 1,250 L==","==5==","==Nov 14=="]],"foot":"3 committed orders wait behind 28 hours of PU-80"},"partes_disp":{"k":"time","chip":"Disperser timesheets · 4 weeks","title":"Line 2 disperser usage","meta":"Operator timesheets · last 4 weeks","cols":["Week","Production","Cleaning","Other stops"],"rows":[["42","37 h","6 h","3 h"],["43","36 h","7 h","3 h"],["44","38 h","6 h","2 h"],["45","35 h","7 h","4 h"]],"foot":"==Cleaning: 6.5 h a week on average; 8 in 10 are dark-to-light changeovers=="},"ov_pu80":{"k":"so","chip":"Sales order SO-5488","title":"Sales order SO-5488","meta":"Industrial customer · PU-80","fields":[["Product","PU-80 · 900 L"],["Date requested by the customer","==Nov 28=="],["Production order","OP-2288"]],"foot":"==Can be made in week 47 with no risk to delivery=="},"draft_secuencia":{"k":"draft","chip":"New sequence · disperser","title":"Proposed sequence · line 2 disperser","meta":"Draft · week 46","to":"Plant manager","body":["1. Light to dark: ES-30 (OP-2294) → AC-15 (OP-2291, OP-2302) → PU-80 (OP-2287).","2. OP-2288 (PU-80, due Nov 28) moves to week 47.","3. Reserve: 4 hours of weighed, ready material in front of the disperser, so it never waits.","==The 3 committed orders arrive on time and cleaning time goes down.==","The schedule changes only if you approve it."],"who":"Plant manager"},"buffers":{"k":"stock","chip":"Raw material safety stock","title":"Safety stock status · raw materials and packaging","meta":"Today 07:00 · 612 items","cols":["Zone","Items","Meaning"],"rows":[["Green","541","Enough coverage"],["Yellow","64","Replenish in the normal cycle"],["==Red==","==7==","==Replenish today=="]],"foot":"Safety stock = real consumption × replenishment lead time, adjusted every week"},"oc_tio2":{"k":"po","chip":"Titanium dioxide · consumption","title":"Titanium dioxide · consumption and replenishment","meta":"Stock moves and purchase orders","fields":[["Consumption, last 3 weeks","==8,400 kg=="],["Stock today","4,100 kg · ==10 days of consumption=="],["Supplier lead time","==12 days=="],["Open order","None"]],"foot":"Input to the constraint: if it runs out, the disperser stops"},"mail_envases":{"k":"mail","chip":"Email · packaging supplier","title":"Delivery of 20 L pails","meta":"Email · Nov 7, 2026 · 16:30","from":"Sales · packaging supplier","to":"Purchasing","body":["Hi,","==If you confirm the order before Thursday, we can deliver the 20 L pails on Monday the 17th.==","After that our plant goes into maintenance.","Regards"],"flag":"No reply · 3 days"},"oc_abiertas":{"k":"po","chip":"Open purchase orders","title":"Open purchase orders · solvents","meta":"Created by the monthly plan","cols":["Order","Input","Amount","Safety stock"],"rows":[["PO-6412","Xylene","$9,800","==Green=="],["PO-6415","Mineral spirits","$7,400","==Green=="],["PO-6419","Butyl acetate","$4,800","==Green=="]],"total":"$22,000","foot":"None of the three is in the yellow or red zone"},"draft_oc":{"k":"draft","chip":"Purchase orders · draft","title":"Today’s replenishment","meta":"Draft · 7 orders","to":"Purchasing manager","body":["<b>Replenish today (red zone)</b>: 7 items, by what was consumed. The largest: 8,400 kg of titanium dioxide, with an expedited partial delivery.","20 L pails: confirm before Thursday to receive on Monday the 17th.","<b>Postpone</b>: PO-6412, PO-6415 and PO-6419, solvents in the green zone, worth $22K.","==No order goes to a supplier without your approval.=="],"who":"Purchasing manager"},"op_atrasadas":{"k":"prod","chip":"Late production orders","title":"Late production orders","meta":"As of Nov 10 · 11 orders","cols":["Order","Liters","Days late","Where it is"],"rows":[["==OP-2251==","==4,000==","==3==","==Waiting for quality control=="],["==OP-2259==","==3,200==","==2==","==Waiting for quality control=="],["OP-2263","2,800","2","Filling"],["OP-2270","2,400","1","Waiting for quality control"],["7 others","3,100","1","Various"]],"foot":"4 orders make up 80% of the late liters"},"partes_cc":{"k":"time","chip":"Timesheets · quality","title":"Quality control team load","meta":"Timesheets · week 45","cols":["Shift","Analysts","Batches checked","Overtime"],"rows":[["Morning","2","38","0"],["==Afternoon==","==1==","==29==","==9=="],["Night","0","—","—"]],"foot":"==The afternoon shift makes 45% of the batches with a single analyst=="},"cola_cc":{"k":"prod","chip":"Release queue","title":"Batches waiting for quality release","meta":"Today 07:00","fields":[["Batches waiting","==14=="],["Average wait","==2.1 days=="],["Constraint batches","5"]],"foot":"A batch that isn’t released can’t ship or be invoiced"},"partes_env":{"k":"time","chip":"Overtime · filling","title":"Night shift overtime · filling","meta":"Timesheets · last 5 weeks","cols":["Week","Overtime hours"],"rows":[["41","10"],["42","12"],["43","11"],["44","11"],["45","11"]],"foot":"==11 h a week on average, always to catch up on daytime delays=="},"mail_cert":{"k":"mail","chip":"Email · quality certificate","title":"Quality certificate · batch L-2644","meta":"Email · Nov 5, 2026 · 09:05","from":"Procurement · mining customer","to":"Sales","body":["Hello,","==To receive the Nov 14 delivery we need the quality certificate for batch L-2644.==","Without it, our warehouse won’t accept it.","Regards"],"flag":"No owner assigned · 5 days"},"wa_muestra":{"k":"wa","chip":"WhatsApp · color sample","title":"Color sample · contractor","meta":"WhatsApp · November 6","msgs":[["them","Site manager · contractor","Nov 6 · 11:20","Hi, ==could you send the pearl gray sample before Friday?== We need the client to approve the color."],["us","Field sales rep","Nov 6 · 11:42","Sure, I’ll ask the lab."]],"flag":"No task created for the lab"},"draft_sup":{"k":"draft","chip":"Plan of the day · supervisor","title":"Plan of the day · plant supervisor","meta":"Draft · Monday Nov 10","to":"Plant supervisor","body":["1. Quality releases the 5 constraint batches first, then OP-2251 and OP-2259.","2. Proposal: move one morning analyst to the afternoon shift this week.","3. Certificate for batch L-2644 → lab, today. Pearl gray sample → lab, Thursday.","4. Filling: with quality caught up, night shift overtime should drop. Measured on Friday.","==Assignments and the shift change are your call.=="],"who":"Plant supervisor"}},"feedTitle":"Coming in now","feed":[["prod","Production order OP-2311","Released · line 2 disperser"],["stock","Stock move","420 kg of titanium dioxide consumed"],["so","Sales order SO-5531","Distributor · 1,800 L of AC-15"],["time","Timesheet · filling","Morning shift closed"],["po","Receipt PO-6398","Acrylic resin · 6,000 kg"],["mail","Email · mining customer","Question about delivery date"]],"kinds":{"mail":"Email","wa":"WhatsApp","quote":"Quote","inv":"Invoice","stock":"Inventory","meet":"Meeting","pdf":"Document","draft":"Draft","prod":"Production","po":"Purchasing","so":"Sales","time":"Timesheets"},"fieldsL":{"from":"From","to":"To"}},"mundo":{"ui":{"st":["fixes","approved","protected"],"note":"Example with the fictional company {co}. Traditional ERP timings are illustrative.","colC":"Item","colV":"Value","plan":"Plan","planBtn":"See plan","planTo":"To be approved by","agent":"agent","rev":"Reviewer","os":{"agent":"{a} agent","agent2":"Finance agent","by":"Approves:","wait":"Waiting for your approval","ok":"Approved","no":"Rejected","count":"{a} of {n} approved","dec":"Decision","of":"of","subj":"Subject","sales":"Sales","fin":"Finance","plat":"Platform","mailRow":"3 sales emails written","mailFig":"3 emails","mailFigL":"ready to send","mailAct":"Send the 3 emails from each salesperson’s own mailbox.","mailYes":"The 3 emails go out from each salesperson’s mailbox and are saved in each customer’s record.","mailNo":"Nothing is sent. The drafts stay in the sales manager’s tray for editing.","bodies":["Hi Rodrigo, I went back to the quote that was left open on the 4th. We have everything in the warehouse today and can deliver on Thursday morning. If you confirm before noon, I will hold the price and book the truck.","Hi Marcela, based on your purchases over the last three months, these are the products you will run out of before the 20th. I prepared the order with your usual quantities; tell me if you want to change anything.","Hi Javier, with the volume you bought this year you qualify for the next price tier from January. I am attaching the table with the detail by product line. If it works for you, we can go over it on Tuesday."],"invRow":"4 invoices to issue","invFigL":"to invoice today","invAct":"Issue the 4 invoices for yesterday’s deliveries.","invYes":"The 4 invoices are issued and each customer receives theirs with the signed delivery note attached.","invNo":"Nothing is issued. The 4 stay pending in the billing list.","tpRow":"System improvement ready to turn on","tpFig":"1 function","tpFigL":"new, already tested","tpAct":"Turn on the “Committed date” field and the process that gives two days of notice.","tpYes":"The field appears on every order and the process runs from tomorrow at 07:00. The change is logged and can be undone.","tpNo":"Nothing changes in production. The proposal stays saved in the test environment.","diffL":"Proposed code change · orders","diff":["committed_date = field.Date(\"Committed date\")","","@every_day(\"07:00\")","def alert_deadlines(orders):","    for order in orders.due_in(days=2):","        order.alert(order.owner, order.dispatch)"],"tests":"14 of 14 tests pass in the test environment","q1":"I went through {n} records overnight. {l}: {v}.","q3":"Is there a way out of that, or do we write it off?","q5":"I left this ready for your approval. {t}","q6":"I will look at it at 07:30 with the team.","th":{"mail":[["a","Sales agent","Three customers were left with something open this week: a quote with no reply, a restock that is due and a price tier they have earned."],["a","Inventory agent","Stock confirmed for the Aldunate Construction quote: everything is in the warehouse and there is a truck on Thursday."],["p","Carla Rojas","With Ñuble, talk about the next tier, not about a discount.","Sales manager"],["a","Sales agent","Fixed. I used the real volume for the year: they qualify for tier 3 from January."],["a","Sales agent","The three emails are written in each salesperson’s tone and are waiting for review."],["p","Carla Rojas","I will review them first thing.","Sales manager"]],"inv":[["a","Finance agent","Four orders were delivered yesterday and all 4 delivery notes came back signed."],["a","Sales agent","Order 4459 is the second delivery for Ñuble Trading. The first one is already invoiced."],["a","Finance agent","The amounts match each order: $12.4M in total. I left the 4 invoices as drafts."],["p","Paula Soto","Does the Lircay Machining one go with the new purchase order?","Billing lead"],["a","Finance agent","Yes. I used the purchase order they emailed on Monday and it is attached to the invoice."]],"tp":[["a","Platform agent","I noticed something: three times this week sales wrote the date promised to the customer in the order notes. The system has nowhere to store it."],["a","Sales agent","Confirmed. Two of those orders shipped late because nobody saw the note."],["a","Platform agent","I built a “Committed date” field and a process that checks the orders every morning and gives two days of notice."],["a","Reviewer","I reviewed the change in the test environment: 14 of 14 tests pass and it does not touch billing."],["p","Andrea Muñoz","Does dispatch get the alert too?","General manager"],["a","Platform agent","Yes, the order owner and dispatch. It is waiting for your approval to go to production."]]}},"dy":{"sys":"{co} system","boss":"General manager","sent":"Sent to the chat","read":"Read","answered":"Answered in 4 seconds","to":"To","hi":"Good morning, Andrea. You have 5 items today. Each one comes with a proposal ready for approval.","chatNote":"It reaches you in the chat your team already uses: Google Chat, Teams or WhatsApp.","mailT":"3 sales emails written, ready for your review","mailD":"Each one uses the real history of the customer: what they were quoted, what they bought and what is still open.","mails":[["Aldunate Construction","Your quote from the 4th: stock confirmed, delivery on Thursday","Hi Rodrigo, I went back to the quote that was left open. We have everything in the warehouse today and…"],["El Roble Hardware","Suggested restock for November","Hi Marcela, based on your purchases over the last three months, these are the products that…"],["Ñuble Trading","Volume pricing proposal for 2027","Hi Javier, with the volume you bought this year you qualify for the next tier…"]],"mailBtn":"Review and send","mailWho":"Sales manager","invT":"Invoices to issue","invD":"Yesterday’s deliveries that already have a signed delivery note. Amounts come from the order, with nothing typed in.","invCols":["Customer","Item","Amount"],"invs":[["Aldunate Construction","Order 4471 · full delivery","$4.8M"],["El Roble Hardware","Order 4468 · full delivery","$2.1M"],["Ñuble Trading","Order 4459 · second delivery","$3.6M"],["Lircay Machining","Order 4473 · full delivery","$1.9M"]],"invTotal":"Total to invoice","invSum":"$12.4M","invBtn":"Issue all 4","invWho":"Billing lead","askWho":"Tomás · sales","askQ":"How much money is tied up in stock that is not moving?","askA":"$61M, 29% of inventory. I took it from stock movements and sales orders; the detail is linked.","askSrc":"The detail is linked, with the record each figure came from.","tpK":"the system improves itself","tpT":"It found a missing function","tpD":"Three times this week sales wrote the date promised to the customer in the order notes. I propose a new field and a process that runs by itself every morning and gives two days of notice. It is already built in the test environment.","tpChg":[["New field","“Committed date” on every order, visible to sales and dispatch."],["New process that runs by itself","Every morning it checks the orders and alerts the owner two days before the deadline."]],"tpNote":"Nothing changes in production until a person turns it on.","tpSee":"See the change","tpBtn":"Turn on","tpOk":"Turned on by","tpWho":"General manager","closeMsg":"End of day. This is what got done and logged, with who approved each item.","closeRows":[["5 of 5","items resolved"],["3","emails sent"],["$12.4M","invoiced"],["1","system improvement turned on"]],"tot":["pieces of work ready","approved by your team","system improvements"]},"morningT":"Your morning report is ready","morningD":"What happened yesterday and what is waiting for your decision today.","morningFor":"Goes to: management","morningRows":["fixes yesterday","approved by your team","waiting for approval","protected this week"],"closeT":"End of day","closeD":"Everything is in the log, with who approved each item.","closeRows":["pieces of work ready","approved by your team","protected today"],"okBy":"Approved by","waiting":"Waiting for approval","did":"What it did","general":"Management","dayOf":"A day at","demoK":{"order":"Draft document","seq":"Schedule reordered","report":"Calculation","notice":"Draft notice"},"rx":{"order":"order|purchase|quote|invoice|statement|collect|credit|renewal|claims|agreements|scholarship|offer for","seq":"resequenc|rescheduled|reassign|moved|moving|transfer|covered|replacement|shift|timetable|route|crew","notice":"alert|notif|draft|repl|reminder|follow-up|invit|report|offer|summon|reconfirm"},"youOk":"You approved","youNo":"You rejected","undo":"Undo","undone":"Undone: back to the previous state","empty":"Approve or reject something in the console above and it will show up here.","permOn":"Has permissions","permOff":"No permissions: it neither reads nor proposes","permLog":"Permission revoked","permBack":"Permission restored","you":"You","watches":"Looks after","now":"now"},"rubros":{"fabrica":{"co":"Tamarugo Paints","logo":"TP","kind":"Industrial paint manufacturer · 1 plant, 4 work centers"},"distribuidora":{"co":"Los Aromos Supply","logo":"LA","kind":"Building materials and hardware distributor · 1 warehouse, 3 routes","mem":[["quote","48,200","sales orders"],["po","6,900","purchase orders"],["stock","212,000","warehouse moves"],["so","15,300","deliveries and routes"],["inv","51,700","invoices and payments"],["wa","33,400","WhatsApp and email orders"]],"qs":[{"id":"d1","q":"Which products are not selling, and how much money is tied up in them?","kw":["stock","selling","tied","warehouse","inventory","money","product"],"scan":{"stock":21200,"quote":5840,"po":310},"area":"Warehouse","ch":{"t":"Stock by days without a sale","sub":"$96M at cost","bars":[["Sold in the last 60 days",71,"$71M","ok"],["61 to 120 days without a sale",13,"$13M","warn"],["Over 120 days without a sale",12,"$12M","bad"]]},"f":["612 products have not sold in over 120 days: <b>$12M tied up</b>.","140 can still move at a discount: they are the ones 9 hardware stores keep asking for.","60 can be returned: the supplier accepts returns until the end of the month."],"act":["Draft plan: clear 140 products and return 60 to the supplier.","General manager"],"fig":["$8.2M","of idle stock to free up"],"yes":"The clearance list for sales and the return request to the supplier are created. The warehouse lead sets the products aside.","no":"Nothing moves. The 612 products stay flagged and the system reviews them again in 30 days."},{"id":"d2","q":"Which customers stopped buying, and how do I win them back?","kw":["customer","stopped","buying","win","sales","lost"],"scan":{"quote":4820,"wa":1130,"stock":260},"area":"Sales","ch":{"t":"Customers by last purchase","sub":"412 active customers","scale":"sqrt","bars":[["Bought this month",331,"331","ok"],["31 to 60 days ago",63,"63","warn"],["Over 60 days ago",18,"18","bad"]]},"f":["18 customers who used to buy every week have not bought in over a month: <b>$9.4M a month</b> in sales.","11 of them last asked for a product that was out of stock.","The other 7 got a price increase that same week."],"act":["Draft offer for each one: a back-in-stock notice for 11 and a revised price for 7.","Sales manager"],"fig":["18 customers","to win back"],"yes":"Each salesperson gets their list with the message already written. They review it and send it themselves.","no":"Nothing is sent. The 18 customers stay on the sales manager’s board."}],"vivo":[{"area":"Dispatch","ag":"Dispatch agent","t":"The north route leaves late every Monday","nodes":["Order","Warehouse","North route","Customer"],"cut":1,"erp":[["Day 1","Records 2 late deliveries on the north route."],["Day 8","It happens again. The dispatch lead mentions it in the meeting."],["Day 20","Asks to change the loading schedule: a request is opened."],["Day 60","The request is waiting. Meanwhile, 3 customers complained."]],"erpEnd":"60 days later, the route leaves at the same time.","det":"On 7 of the last 8 Mondays the north route left after 10:00: weekend orders are only picked that morning.","ev":["8 Mondays","7 late departures","3 complaints"],"before":"Weekend orders are picked on Monday at 8:00.","after":"Weekend orders are picked on Saturday at closing, and the north route loads first.","test":"With the orders of the last 2 months: the route would have left before 8:30 on all 8 Mondays.","who":"Dispatch lead","big":"7 → 0","bigL":"late departures in the test"}]},"automotriz":{"co":"Canelo Motor Group","logo":"CM","kind":"Vehicle sales, workshop and parts · 3 branches","mem":[["so","9,400","vehicle sales and quotes"],["prod","78,700","workshop orders"],["stock","141,000","parts moves"],["po","5,200","orders to importers"],["inv","36,800","invoices and loans"],["wa","27,900","WhatsApp requests"]],"qs":[{"id":"a1","q":"Which vehicles have been on the lot longest, and how much money is tied up?","kw":["vehicle","car","lot","unit","stock","money","tied"],"scan":{"so":1240,"stock":640,"wa":310},"area":"Vehicles","ch":{"t":"Units by days on the lot","sub":"64 units · $1,180M","bars":[["Under 45 days",39,"39 units","ok"],["45 to 90 days",18,"18 units","warn"],["Over 90 days",7,"7 units","bad"]]},"f":["7 units have been on the lot for over 90 days: <b>$126M tied up</b>.","3 are a model that sells in 20 days at branch 3, where there are none left.","The other 4 have open quotes with no follow-up for over a week."],"act":["Draft: transfer 3 units to branch 3 and pick up the 4 quotes again with a financing option.","Commercial manager"],"fig":["$126M","in units to move"],"yes":"The 3 transfers and the 4 follow-ups are created. Each salesperson reviews their message before sending it.","no":"No unit moves. The 7 stay flagged on the commercial manager’s board."},{"id":"a2","q":"How many workshop hours are lost this week, and who can fill them?","kw":["workshop","hour","mechanic","service","maintenance","schedule"],"scan":{"prod":7870,"so":214,"wa":96},"area":"Service","ch":{"t":"Workshop use by day","sub":"Week 46 · 5 mechanics","mark":100,"markL":"capacity","bars":[["Monday",92,"92%",""],["Tuesday",88,"88%",""],["Wednesday",81,"81%",""],["Thursday",62,"62%","bad"],["Friday",95,"95%",""]]},"f":["On Thursday there are <b>6 free hours</b> in the workshop.","214 customers are overdue for service based on their mileage.","38 live less than 15 minutes from the branch and have come on a weekday before."],"act":["Draft invitation for the 38 closest customers, with Thursday’s free hours.","Service manager"],"fig":["6 hours","of workshop to fill"],"yes":"The notices are ready to send, and the hours are booked as customers confirm.","no":"Nothing is sent. The 6 hours stay free in the schedule."}],"vivo":[{"area":"Parts","ag":"Parts agent","t":"The parts desk says «we don’t have it» when the part is there","nodes":["Request","Parts desk","Warehouse","Sale"],"cut":1,"erp":[["Day 1","The salesperson searches by name and cannot find the filter."],["Day 5","Answers «we don’t have it». The part was under another code."],["Day 30","The report shows lower parts-desk sales. Nobody knows why."],["Day 120","Unifying the codes is quoted as a separate project."]],"erpEnd":"120 days later, the answer is still «we don’t have it».","det":"In 41 requests this month the answer was «we don’t have it», and the part was in the warehouse under another code.","ev":["41 requests","3 codes per part","$2.3M unsold"],"before":"The parts desk searches by each branch’s code.","after":"The parts desk searches by license plate or vehicle, and the system joins the codes of the 3 branches.","test":"With last month’s requests: 37 of the 41 would have found the part in the warehouse.","who":"Parts manager","big":"41 → 4","bigL":"«we don’t have it» answers in the test"}]},"legal":{"co":"Arrayán Law","logo":"AL","kind":"Law firm · 3 practice areas","mem":[["pdf","18,400","briefs and contracts"],["quote","1,240","matters and cases"],["time","96,300","time entries"],["meet","2,180","deadlines and hearings"],["inv","7,900","invoices and statements"],["mail","64,500","client emails"]],"qs":[{"id":"l1","q":"How many hours worked are still unbilled?","kw":["hour","unbilled","bill","statement","money","fee"],"scan":{"time":1640,"quote":38,"inv":212},"area":"Hours","ch":{"t":"October hours by status","sub":"1,640 hours logged","scale":"sqrt","bars":[["Billed",1318,"1,318 h","ok"],["In statements",180,"180 h","warn"],["Unbilled",142,"142 h","bad"]]},"f":["142 October hours are not in any statement: <b>$11.6M</b>.","96 hours belong to 3 matters with an agreed hourly rate.","46 hours exceed the cap on 2 fixed-fee matters: that has to be discussed with each client."],"act":["Draft statements for the 3 hourly matters, and a note to the partner in charge about the 46 hours over the cap.","Managing partner"],"fig":["$11.6M","ready to bill"],"yes":"The 3 statements are ready with the detail per matter. Each partner reviews theirs before it goes out.","no":"Nothing is issued. The 142 hours stay flagged for month-end."},{"id":"l2","q":"Which deadlines fall this week, and which have no draft?","kw":["deadline","due","hearing","draft","brief","week"],"scan":{"meet":218,"pdf":1840,"mail":77},"area":"Deadlines","ch":{"t":"This week’s deadlines","sub":"7 deadlines · 14 active matters","bars":[["Brief ready",4,"4","ok"],["Being drafted",2,"2","warn"],["No draft",1,"1","bad"]]},"f":["Of this week’s 7 deadlines, <b>1 is due in 3 days and has no draft</b>.","The firm has 2 similar briefs, from the same court and on the same subject.","Thursday’s hearing still has no file put together."],"act":["Draft of the brief based on the firm’s 2 precedents, and the hearing file with briefs, evidence and timeline.","Partner in charge"],"fig":["3 days","left for the deadline with no draft"],"yes":"The draft and the file are saved in the matter. The attorney in charge reviews and signs them.","no":"No draft is created. The deadline stays red in the firm’s calendar."}],"vivo":[{"area":"Clients","ag":"Client agent","t":"Clients’ powers of attorney expire without warning","nodes":["Company","Powers","Validity","Client"],"cut":1,"erp":[["Day 1","The expiry date sits in a record nobody reviews."],["Day 30","The power of attorney expires. Nobody notices."],["Day 45","The client cannot sign at the bank and calls the firm."],["Day 46","It is processed in a rush. The alert is requested as a development."]],"erpEnd":"46 days later, the next power of attorney also expires without warning.","det":"In 12 months, 9 client powers of attorney expired without warning. 4 ended in rush filings.","ev":["212 companies","9 expired powers","4 rush filings"],"before":"Powers of attorney are checked when the client asks.","after":"Each power of attorney gives 30 days’ notice before expiring, with the renewal and the client letter already prepared.","test":"With last year’s expiries: all 9 would have had notice and renewal in time.","who":"Senior associate","big":"9 → 0","bigL":"powers expired without warning"}]},"constructora":{"co":"Quillay Builders","logo":"QB","kind":"Construction company · 4 sites under way","mem":[["quote","38,600","budget line items"],["prod","12,900","site progress records"],["po","9,700","purchase orders"],["pdf","1,460","subcontracts and payment applications"],["inv","22,300","invoices and collections"],["time","51,800","attendance and crews"]],"qs":[{"id":"c1","q":"Which site is going over budget, and why?","kw":["site","budget","overrun","cost","item","over"],"scan":{"quote":3860,"po":412,"inv":95},"area":"Budgets","ch":{"t":"Actual cost versus budget, by line item","sub":"Los Robles site","mark":100,"markL":"budget","bars":[["Structure",97,"97%",""],["Installations",101,"101%",""],["Finishes",108,"108%","bad"],["Site works",94,"94%",""]]},"f":["Finishes is running <b>8% over budget</b>: a projected overrun of $5.6M.","The cause is the tiling: it was bought at a price 14% above the quote.","2 of 5 tile purchases are still to be made: it can still be corrected."],"act":["Draft requote for the 2 remaining purchases, with 3 suppliers.","Project manager"],"fig":["$5.6M","of overrun that can be avoided"],"yes":"The quote requests are ready. The purchasing lead reviews and sends them.","no":"No requote. The line item stays red on the site board."},{"id":"c2","q":"What work is done and still not billed?","kw":["bill","change order","payment","done","invoice","money"],"scan":{"inv":2230,"quote":640,"pdf":58},"area":"Finance","ch":{"t":"Work done by billing status","sub":"$214M done in October","bars":[["Collected",168,"$168M","ok"],["Payment application filed",33,"$33M","warn"],["Not billed",13,"$13M","bad"]]},"f":["There is <b>$13M of work done and not billed</b>.","$9.2M is a change order the client approved 3 weeks ago.","$3.8M is extra work done without a change order: the backup is missing."],"act":["Draft billing for the approved change order, and a change order for the second one with site photos and measurements.","Finance manager"],"fig":["$13M","to bill"],"yes":"The billing and the change order are ready to sign. Nothing goes to the client without that review.","no":"Nothing is filed. Both items stay on the finance board."}],"vivo":[{"area":"Subcontracts","ag":"Finance agent","t":"Payment applications get paid with expired certificates","nodes":["Subcontract","Certificate","Payment application","Payment"],"cut":1,"erp":[["Day 1","The payment application is approved. The labor certificate expired yesterday."],["Day 3","It is paid. Nobody cross-checked the two dates."],["Day 40","An inspection asks for the certificates: 2 are missing."],["Day 41","A new validation is requested from the system vendor."]],"erpEnd":"41 days later, the cross-check is still done by hand.","det":"In 6 months, 5 payment applications were paid with the subcontractor’s labor certificate expired.","ev":["64 payment applications","5 with expired certificate","$38M paid"],"before":"A payment application is approved with the site manager’s signature.","after":"No payment application moves to payment unless the subcontractor’s labor certificate is valid.","test":"With the payments of the last 6 months: all 5 would have been held until the certificate arrived.","who":"Contracts administrator","big":"5 → 0","bigL":"payments with expired certificate"}]},"clinica":{"co":"Los Boldos Medical Center","logo":"LB","kind":"Medical center · 14 rooms, 9 specialties","mem":[["time","184,000","booked appointments"],["quote","41,200","recorded visits"],["stock","62,700","supply moves"],["inv","58,900","insurer claims"],["po","3,100","purchase orders"],["wa","71,300","confirmations and reminders"]],"qs":[{"id":"k1","q":"How many room hours are lost, and how do I fill them?","kw":["hour","room","schedule","patient","lost","confirm","waitlist"],"scan":{"time":18400,"wa":2210,"quote":270},"area":"Scheduling","ch":{"t":"Room occupancy by day","sub":"Week 46","mark":100,"markL":"capacity","bars":[["Monday",91,"91%",""],["Tuesday",87,"87%",""],["Wednesday",89,"89%",""],["Thursday",74,"74%","bad"],["Friday",93,"93%",""]]},"f":["On Thursday there are <b>3 free orthopedics hours</b>, and 11 of tomorrow’s patients have not confirmed.","The orthopedics waitlist has 27 patients.","Patients who do not confirm the day before miss 4 out of 10 appointments."],"act":["Draft: offer the 3 hours to the waitlist and reconfirm tomorrow’s 11 patients.","Scheduling lead"],"fig":["7 hours","of room time not lost"],"yes":"The messages are ready. Hours are reassigned as patients confirm.","no":"Nothing is sent. The free hours stay visible in the schedule."},{"id":"k2","q":"Which claims did the insurer reject, and how much money is it?","kw":["claim","reject","insurer","insurance","collect","money"],"scan":{"inv":1240,"quote":310,"wa":64},"area":"Insurers","ch":{"t":"October claims by status","sub":"1,240 claims sent","scale":"sqrt","bars":[["Paid",1094,"1,094","ok"],["Under review",115,"115","warn"],["Rejected",31,"31","bad"]]},"f":["31 claims were rejected: <b>$8.7M uncollected</b>.","24 have the same error: a procedure code that changed in September.","The other 7 are missing the attached medical order."],"act":["Draft resubmission of the 24 claims with the corrected code, and a list of the 7 missing orders.","Insurer relations lead"],"fig":["$8.7M","to resubmit for collection"],"yes":"The 24 claims are ready to resubmit, and the 7 orders are requested from each specialist.","no":"Nothing is resubmitted. The 31 claims stay flagged on the insurer board."}],"vivo":[{"area":"Supplies","ag":"Supply agent","t":"Supplies expire in the stockroom","nodes":["Purchase","Stockroom","Room","Visit"],"cut":0,"erp":[["Day 1","A batch of anesthetic arrives that expires in 60 days."],["Day 20","The newest batch keeps being used: it is the one at hand."],["Day 60","The batch expires and is written off."],["Day 61","An expiry report is requested from the system vendor."]],"erpEnd":"61 days later, the same volume as always is ordered.","det":"In 6 months, 14 batches were written off for expiry: $5.3M.","ev":["14 expired batches","$5.3M","same order every month"],"before":"The same volume is ordered every month and any batch gets used.","after":"The batch that expires first is used first, and the order follows each room’s actual consumption.","test":"With the consumption of the last 6 months: 12 of the 14 batches would have been used in time.","who":"Supply lead","big":"14 → 2","bigL":"expired batches in the test"}]},"colegio":{"co":"Los Maitenes School","logo":"LM","kind":"School · 740 students, pre-K to 12th grade","mem":[["quote","740","student records"],["time","96,200","attendance and grade entries"],["inv","8,900","tuition and payments"],["mail","23,400","messages with families"],["pdf","312","applications"],["po","1,870","maintenance requests"]],"qs":[{"id":"e1","q":"How much tuition is overdue, and which families should we talk to?","kw":["overdue","tuition","payment","famil","debt","money","collect"],"scan":{"inv":8900,"mail":412,"quote":88},"area":"Finance","ch":{"t":"October tuition","sub":"740 students","scale":"sqrt","bars":[["Up to date",652,"652","ok"],["1 month behind",38,"38","warn"],["2 or more months behind",50,"50","bad"]]},"f":["Overdue tuition rose to <b>6.8%</b>: $11.3M.","31 of the 50 families furthest behind always paid on time until this semester.","12 have already asked for a payment plan and nobody answered."],"act":["Draft payment plans based on each family’s history, starting with the 12 that already asked.","Administrator"],"fig":["$11.3M","in plans to discuss"],"yes":"Each plan is ready for the administrator to review and discuss with the family.","no":"Nothing is sent. The 50 families stay on the administration board."},{"id":"e2","q":"Which students are at academic risk this semester?","kw":["student","risk","academic","grade","subject","attendance","fail"],"scan":{"time":9620,"quote":380,"mail":51},"area":"Academics","ch":{"t":"Students by subjects at risk","sub":"7th to 12th grade · 380 students","scale":"sqrt","bars":[["No subjects at risk",329,"329","ok"],["1 subject at risk",42,"42","warn"],["2 or more subjects",9,"9","bad"]]},"f":["<b>9 students</b> have 2 or more subjects at risk.","6 of them also dropped in attendance over the last month.","In 5 cases the parents have not been called in this semester."],"act":["Draft support plan for the 9 students, with the meeting request for each family.","Academic coordinator"],"fig":["9 students","with a support plan"],"yes":"Each homeroom teacher gets their student’s plan and the meeting request ready to send.","no":"Nobody is called in. The 9 students stay flagged on the academic board."}],"vivo":[{"area":"Families","ag":"Communications agent","t":"Requests from families get lost between emails","nodes":["Parent","Request","Owner","Reply"],"cut":1,"erp":[["Day 1","A parent’s email arrives in the general mailbox."],["Day 4","It is forwarded to the dean’s office. Nobody owns it."],["Day 12","The parent insists. The reply goes out that day."],["Day 90","Buying a requests module is being considered."]],"erpEnd":"90 days later, requests still land in a mailbox.","det":"This semester, 87 of 620 requests from families took more than a week to answer.","ev":["620 requests","87 over 7 days","3 different mailboxes"],"before":"Requests arrive by email and whoever sees them answers.","after":"Every request gets an owner and a 2-day deadline, with a draft reply using the student’s data.","test":"With this semester’s requests: 81 of the 87 late ones would have had an owner the same day.","who":"Dean of students","big":"87 → 6","bigL":"late requests in the test"}]},"servicios":{"co":"Peumo Consulting","logo":"PC","kind":"Consulting firm · 38 people, 21 active projects","mem":[["quote","1,960","proposals and contracts"],["prod","640","projects and deliverables"],["time","212,000","time entries"],["inv","6,300","invoices and collections"],["meet","3,900","client meetings"],["mail","88,100","emails and chats"]],"qs":[{"id":"s1","q":"How many hours worked are still unbilled?","kw":["hour","unbilled","bill","scope","money","margin"],"scan":{"time":5480,"prod":210,"inv":146},"area":"Hours","ch":{"t":"October hours by status","sub":"5,480 hours logged","scale":"sqrt","bars":[["Billed",5214,"5,214 h","ok"],["Under review",180,"180 h","warn"],["Unbilled",86,"86 h","bad"]]},"f":["86 October hours are not on any invoice: <b>$5.2M</b>.","They belong to 4 projects that closed the month without a billing milestone.","Project South also has 40 hours outside the contract scope: $2.4M."],"act":["Draft invoices with the detail per project, and a proposal to bill Project South’s extra scope.","Partner in charge"],"fig":["$7.6M","between hours and extra scope"],"yes":"The invoices are ready for review. The extra-scope conversation is led by the partner in charge.","no":"Nothing is invoiced. The 86 hours stay flagged for month-end."},{"id":"s2","q":"Who is overloaded, and which project is at risk?","kw":["overload","workload","team","project","risk","late","people"],"scan":{"time":2120,"prod":640,"meet":48},"area":"Team","ch":{"t":"Workload per person","sub":"Next 2 weeks","mark":100,"markL":"capacity","bars":[["Senior analyst",128,"128%","bad"],["Consultant 2",104,"104%","warn"],["Consultant 4",71,"71%",""],["Analyst 3",58,"58%",""]]},"f":["The senior analyst is at <b>128% workload</b>, and Project Andes is due in 6 days at 70% progress.","2 people have slack from Monday and have worked with that client before.","Moving 2 tasks leaves the whole team under 100%."],"act":["Draft reassignment: 2 Project Andes tasks go to the 2 people with slack.","Project manager"],"fig":["6 days","to make it on time"],"yes":"The reassignment is in the plan, and each person gets their tasks with the project context.","no":"Nothing is reassigned. Project Andes stays red on the board."}],"vivo":[{"area":"Proposals","ag":"Proposal agent","t":"Proposals go without follow-up","nodes":["Proposal","Sent","Follow-up","Close"],"cut":1,"erp":[["Day 1","A $24M proposal is sent."],["Day 9","Nobody called. The system does not alert."],["Day 30","The client hired another firm."],["Day 31","It is marked «lost» and a funnel report is requested."]],"erpEnd":"31 days later, follow-up depends on each partner’s memory.","det":"Of the last 40 proposals, 17 had no follow-up in the first week. Only 2 of those closed.","ev":["40 proposals","17 without follow-up","2 of 17 closed"],"before":"Following up on each proposal is up to whoever sent it.","after":"After 4 days without a reply, the system leaves the follow-up drafted with a similar case from the client.","test":"With last semester’s proposals: all 17 would have had a follow-up ready on day four.","who":"Commercial director","big":"17 → 0","bigL":"proposals without follow-up"}]}}},"askx":{"ui":{"idleK":"Work console","idle":"Pick an order or type your own. The system queries the company model, does the math and leaves an action ready to approve.","order":"Order","steps":["Queries","Computes","Proposes","Approves"],"working":"Working","ready":"Ready for approval","okSt":"Approved","noSt":"Rejected","approve":"Approve","reject":"Reject","again":"Undo","youOk":"You approved","inReal":"In the real company, approved by:","youNo":"You rejected","findings":"What it found","demo":"Demo: nothing is actually sent."},"q":{"obso":{"area":"Inventory","chart":{"t":"Inventory by age","sub":"$214K at cost","bars":[["0 to 90 days",118,"$118K","ok"],["91 to 180 days",35,"$35K","warn"],["Over 180 days or expiring first",61,"$61K","bad"]]},"fig":"$61K","figL":"of capital to free up","yes":"3 tasks are created: PB-10 formula change for the lab, an LT-20 offer to 2 distributors and a notice to the 9 customers with uncollected batches. Each owner reviews theirs before anything goes out.","no":"Nothing is created. The plan is archived with your reason and the system adjusts its criteria for the next inventory review."},"restr":{"area":"Production","chart":{"t":"Use of each work center","sub":"Week 46","mark":100,"markL":"capacity","bars":[["Weighing",65,"65%",""],["Line 2 disperser",127,"127%","bad"],["Mill",71,"71%",""],["Filling",73,"73%",""]]},"fig":"3 orders","figL":"back on time","yes":"The new sequence goes into the disperser schedule from the next shift, and sales gets the PU-80 date to confirm with the customer.","no":"The schedule stays as it was. The 3 dated orders stay flagged red on the plant manager’s board."},"repo":{"area":"Purchasing","chart":{"t":"Materials by safety stock","sub":"612 raw materials and packaging items","scale":"sqrt","bars":[["Enough coverage",541,"541","ok"],["Replenish in the normal cycle",64,"64","warn"],["Replenish today",7,"7","bad"]]},"fig":"$22K","figL":"of purchases not needed today","yes":"The 7 orders are ready to send to each supplier and the 3 solvent orders are postponed. The purchasing manager reviews each one before it goes out.","no":"No order is created. Titanium dioxide keeps a daily alert until someone decides."},"equipo":{"area":"Team","chart":{"t":"Late liters by order","sub":"11 late orders","bars":[["OP-2251 · waiting for quality",4000,"4,000 L","bad"],["OP-2259 · waiting for quality",3200,"3,200 L","bad"],["OP-2263 · filling",2800,"2,800 L","warn"],["OP-2270 · waiting for quality",2400,"2,400 L","warn"],["7 others",3100,"3,100 L",""]]},"fig":"4 orders","figL":"explain 80% of the delay","yes":"The supervisor gets the plan for the day, quality releases the bottleneck batches first and the 2 commitments get an owner and a date.","no":"Nothing is assigned. The 2 ownerless commitments stay visible on the supervisor’s board."}}},"vivo":{"steps":["Detects","Proposes","Tests","Approves","In production"],"st":{"prob":"Problem detected","prop":"Change proposed","test":"Testing in a sandbox","ready":"Ready for approval","ok":"In production"},"evidence":"Evidence","before":"Rule today","after":"New rule","tested":"Test in a separate environment","approve":"Approve","okBy":"Approved by","live":"The new rule applies from today. It stays in the log and can be rolled back.","erpWait":"Still waiting","usDone":"Solved the same day","agent":"Agent","events":[{"area":"Purchasing","ag":"Purchasing agent","t":"Supplier 12 is late almost every time","nodes":["Supplier 12","Purchasing","Inventory","Production"],"cut":0,"erp":[["Day 1","Records the receipt 5 days late."],["Day 9","The purchasing manager spots it in a monthly report."],["Day 12","Asks to change the lead time in the system: a ticket is opened."],["Day 40","The ticket waits for development. Meanwhile, 2 more stock-outs."]],"erpEnd":"40 days later, the rule is still the same.","det":"Late in 9 of its last 11 deliveries: 5 days on average.","ev":["11 receipts","9 late","4 stock-outs in 6 months"],"before":"Order from supplier 12 when 7 days of stock remain.","after":"Order from supplier 12 when 15 days of stock remain.","test":"With the last 6 months of consumption: the 4 stock-outs would have been 0, with $1.2K more average stock.","who":"Purchasing manager","big":"4 → 0","bigL":"stock-outs in the test"},{"area":"Finance","ag":"Finance agent","t":"Small purchases wait 2 days for a signature","nodes":["Request","Approval","Purchase order","Supplier"],"cut":1,"erp":[["Day 1","The $180 order sits as \"pending signature\"."],["Day 3","The general manager signs it among 40 other orders."],["Day 30","Nobody measures the wait: the workflow is the one that came configured."],["Day 90","Changing the approval workflow is quoted as a project."]],"erpEnd":"90 days later, every small purchase still waits.","det":"71% of orders are under $500 to regular suppliers, and wait 2.1 days for a signature that is never refused.","ev":["312 orders","0 rejections","2.1 days of waiting"],"before":"Every purchase order is signed by the general manager.","after":"Under $500 and with a regular supplier, the purchasing manager approves. The general manager sees the weekly summary.","test":"With the orders of the last 3 months: 221 would have gone out the same day, and none of the rejected ones changes path.","who":"General manager","big":"2.1 days → 0","bigL":"of waiting on small purchases"},{"area":"Production","ag":"Production agent","t":"The cost of LT-20 latex does not match the plant","nodes":["LT-20 recipe","Cost","Price","Sales"],"cut":0,"erp":[["Day 1","Standard cost uses a 2% scrap rate, loaded 3 years ago."],["Day 30","The margin report shows 35%. Everything looks fine."],["Day 180","An inventory variance shows up at year-end close."],["Day 200","Someone builds a spreadsheet to find where it comes from."]],"erpEnd":"200 days later, it is still sold at the wrong cost.","det":"Actual scrap over the last 46 orders is 6%, not 2%. The real LT-20 margin is 31%.","ev":["46 orders","actual scrap 6%","margin 31%, not 35%"],"before":"LT-20 cost with a standard 2% scrap rate.","after":"LT-20 cost with actual scrap from the last 12 weeks, recalculated monthly.","test":"Recalculated on the quarter’s sales: 3 customers buy below the minimum margin. The price list stays as a separate proposal.","who":"Operations manager","big":"31%","bigL":"real margin, hidden before"}]},"cx":{"ui":{"stepsN":"{n} steps","play":"Play the demo","replay":"Watch again","stop":"Pause","dossier":"Open the full case","step":"Step","of":"of","yourTurn":"Your turn: tap, drag or pick a step.","ctx":"Context","problem":"The problem","built":"What we built","numbers":"Verifiable figures","honest":"The honest part","hidden":"What we don’t show","stepsLabel":"Demo steps"},"legal":{"steps":[{"t":"The portfolio, read once","d":"Five family groups and their companies (all fictional). Each node is a live profile built from deeds, powers of attorney and balance sheets."},{"t":"Effective ownership","d":"The system follows the chain: who owns what, even through another company. Every percentage comes with its document and page."},{"t":"Time machine","d":"Who owned it on March 3, 2019, based on what was known at the time? The map goes back to that snapshot."},{"t":"A new regulation drops","d":"The system checks it against the whole portfolio and flags the affected companies."},{"t":"One draft per client","d":"For each affected company it drafts a letter. Nothing goes out until the lawyer reviews it."}],"eff":"Effective ownership","chain":"Chain","proof":"Evidence","proofDoc":"Fictional deed · p. {p}, clause {c}","timeLabel":"Snapshot date","tNow":"Today","tPast":"Mar 3, 2019","t2019":"Snapshot as of Mar 3, 2019, based on what was known then. Dotted lines did not exist yet.","notYet":"Did not exist yet on that date","pending":"Pending: lawyer review","share":"Stake","others":"Other shareholders, outside the portfolio"},"grupo":{"steps":[{"t":"The sales floor","d":"The parts counter and the coded display cases M1–M6. The real model was built from 23 photos, a hand sketch and measurements dictated by voice."},{"t":"The warehouse behind it","d":"Six racks (A–F), four levels each. Every box is a fictional product with its exact location."},{"t":"Color = how much it sells","d":"Darker means it sells more. On the floor, the glow shows where pickers walk the most."},{"t":"Today, fast movers are scattered","d":"In the simulation of the real case, only 13% of sales sit within 15 m of the counter."},{"t":"Re-slot by turnover","d":"Fast movers move next to the counter, at hand height. In the simulation, 55% of sales end up within 15 m."},{"t":"The path of one order","d":"Picking 3 products: 104 m of walking with today’s layout, 73 m with the proposed one (simulation)."}],"labels":{"entrada":"Customer entrance","sala":"Sales floor","meson":"Counter","vitrinas":"Display cases M1–M6","bodega":"Warehouse · racks A–F","anden":"Receiving","ring":"15 m from the counter","rack":"Rack"},"hud":{"k1":"Sales within 15 m of the counter","k2":"Path of a 3-product order","now":"Today","prop":"Proposed","v1":["13%","55%"],"v2":["104 m","73 m"],"note":"Simulation of the real case, with partly assumed measurements."},"sumK":"Simulation figures","legend":"Box color = how much it sells","lo":"Little","hi":"A lot","order":"Layout","route":"Picking path","search":"Find a product","searchPh":"e.g. batteries","go":"Find","notFound":"Not in this sample model. Try: {list}.","found":"Found: flying to its shelf.","dist":"Distance to counter (model)","hint":"Drag to orbit · scroll or pinch to zoom · tap a box to see its profile."},"meson":{"title":"Counter over WhatsApp · being rolled out","badge":"Simulation · fictional data","shop":"Counter · parts and service","shopSub":"Store WhatsApp","steps":[{"t":"A WhatsApp comes in","d":"A customer asks for brake pads with the make and year. That is not enough: the same model and year can take different parts depending on the build date."},{"t":"Identifies the car","d":"Asks for the license plate and recognizes the exact vehicle, with its build date."},{"t":"Checks the fitment catalog","d":"Searches 9,329 part ↔ vehicle fitments, each with its source and confidence level."},{"t":"Stock and shelf","d":"Checks inventory and the warehouse location: the same one the 3D model below shows."},{"t":"Recommends and sends payment","d":"Replies with the exact part, the list price the team set and a payment link."},{"t":"Paid, with the team watching","d":"Confirms payment and leaves the pick ticket ready for the warehouse. Anything outside the rules goes to a person."}],"sideK":"What the system checks","q":"Hi, do you have front brake pads for a 2018 Condor 1.6?","askPlate":"Hi. To get you the exact part, could you confirm the license plate?","plate":"DEMO-18","vehicle":"Thanks. It is a Condor 1.6 sedan built in November 2017: the front disc changes from that date on, so the pad changes too.","match":"I checked the fitment catalog: the right part is code {sku}.","stock":"We have 6 sets at the main branch. List price: $32.90 per set.","pay":"Here is the payment link. You can pick it up at the counter today or book the installation at our service bay.","payBtn":"Pay $32.90 · payment link","paid":"Done, paid.","done":"Payment received. Your order is ready for pickup at the counter.","sys":"Paid · pick ticket for the warehouse · rack {rack} · level {level}","s0":{"h":"A question with make and year","p":"It is what almost every customer types. The system does not guess: before recommending anything, it identifies the exact car."},"s1":{"h":"Vehicle identified","rows":[["Model","Condor 1.6 sedan (fictional)"],["Year","2018"],["Built","November 2017"],["Plate","DEMO-18 (fictional)"]]},"s2":{"h":"Fitment catalog","n":"9,329","l":"part ↔ vehicle fitments, each with its source and confidence level (A official · B single source · C to validate)","ok":"Condor 1.6 · from 11-2017 · confidence A","no":"Condor 1.6 · up to 10-2017 · does not fit","rule":"If confidence is not A or sources disagree, the system does not recommend: the case goes to a salesperson."},"s3":{"h":"Front brake pads","k":"Fictional product","rows":[["Code","{sku}"],["Stock at the main branch","6 sets"],["Warehouse location","rack {rack} · level {level}"],["Distance to the counter (model)","≈ {dist} m"]],"btn":"See it in the 3D warehouse"},"s4":{"h":"Price and payment","p":"Current list price, set by the team. The link comes from the store’s payment provider; no off-policy discounts."},"s5":{"h":"Paid","rows":[["Payment","confirmed (simulated)"],["Pick ticket","ready for the warehouse"],["Pickup","at the counter, or installation at the service bay"]],"team":"The team sets prices and rules and supervises. Out of stock, confidence other than A, a discount request or a customer with debt: it goes to a person.","state":"Being rolled out: this is how it is being put in place. These are not measured results."},"noLoc":"see the 3D model"},"speakercoach":{"steps":[{"t":"An email arrives","d":"A student asks to move their class to another time (fictional example)."},{"t":"The area agent prepares it","d":"It reads the whole thread, checks the schedule and real availability, and writes the draft."},{"t":"The reviewer checks it","d":"It checks the draft against sources and team rules before anyone sees it."},{"t":"A person approves with a code","d":"Leadership sees the full text and replies “12A”, without opening the inbox."},{"t":"It goes out and becomes a rule","d":"Sent from the same inbox, in the same thread. If someone corrected it, the correction becomes a rule for next time."}],"rev":"Reviewer","revInfo":{"t":"Reviewer agent","d":"Checks every draft against sources and team rules before it reaches a person.","decide":"The rules it applies"},"mail":{"from":"Student · group course","subj":"Moving my Thursday class","body":"Hi, can I switch to the Tuesday group?"},"draftK":"Draft by the Operations agent","draft":"Hi! Yes, there is a seat in the Tuesday 7 pm group. You’re enrolled, and a calendar invite is on its way.","checksK":"Review","checks":["Real availability in the schedule","Group-change rule","Same inbox, same thread"],"approveK":"For leadership","approve":"Approve and send","no":"Don’t send","code":"12A","codeNo":"12","sent":"Sent in the same thread","heldBack":"Held back. The agent asks what to change.","feedIn":"New email · schedule change","feedDraft":"Draft ready with real availability","feedRev":"Review passed","feedOk":"Approved with 12A · sent"},"dossier":{"legal":{"k":"Consigliere · full case","t":"A system for a tax and corporate law firm","ctx":"A tax and corporate law firm that advises family groups (not named). <b>Status:</b> exploration and a demo on a 100% fictional twin firm, with no signed contract and no real data.","problem":["Years of deeds, statements, certificates, powers of attorney and balance sheets scattered across folders and email, much of it scanned and duplicated.","The picture of a company or a family group (who owns what, who can sign) is rebuilt by hand every time.","Accounting and law live apart: the cross-checks a tax authority would run, forgotten money and deadlines depend on the lawyer’s memory."],"built":[["Catalog","About 90 functions across 14 modules, with the data each one needs, so every fact is extracted only once."],["Evidence for every fact","A data dictionary and a single extraction schema: every fact with its document, page and box."],["Fictional twin","150 families, 523 companies and 12 types of seeded anomalies, with known correct answers."],["Engine","Company profiles, group map with effective ownership, time machine, meeting snapshot, new rule → affected clients → one draft per client, internal auditor and deadline watch."],["Principles","The system doesn’t guess (a “to confirm” queue), autonomy is granted in levels and nothing goes to a client or the tax authority without a person."]],"numbers":[["≈90","functions across 14 modules"],["150 · 523","fictional families and companies"],["12","types of seeded anomalies"]],"honest":"We don’t publish an accuracy rate: on data that already comes structured it would be nearly circular. The real test is reading real documents, which hasn’t been run yet.","hidden":"The firm, its clients and any real data. Everything in the demo is fictional."},"grupo":{"k":"Auto parts & hardware group · full case","t":"A system that knows every part and every car","ctx":"A family-owned Chilean group in auto parts, auto services and hardware: three companies, counter sales, a service shop and wholesale, running on a desktop ERP with no source code. <b>Status:</b> being deployed. Working prototypes, tested and deployed internally with ERP data as of Jul 10, 2026; staff don’t use them in daily operations yet and the final ERP isn’t contracted yet.","problem":["The counter recommended parts from memory: the same make and year can need different parts depending on the build date.","The ERP didn’t store what matters: 0 of 78,775 service orders had a license plate or vehicle, and every receipt went to a “generic customer”.","Triple data entry in the service shop: paper order, quote and voucher.","A messy product master: of 14,213 products, only 201 (1.4%) were complete. No bin locations in inventory."],"built":[["Sep 27 → Oct 13","Assessment and demos: ERP readout, sample store and counter, and a demo WhatsApp line that quoted with real price and stock and handed off to a salesperson when it lacked the data."],["Oct 24","ERP mirror: 364 tables and 30.15 million rows, 0 differences, without touching production."],["Oct 24 → 29","One product master of 14,213 items; 4,932 names reviewed one by one by 8 agents; 9,329 part ↔ vehicle fitments with source and confidence level."],["Oct 24 → 28","3D warehouse and sales floor: slotting by turnover, heat map, picking path, search and fly-to-shelf."],["Oct 28","Cloud operations to test as if live: checkout, barcode vouchers, purchasing and receiving, service by license plate, battery warranties and offline checkout."],["In progress","Counter and service-shop intelligence: over WhatsApp, the system identifies the car, recommends from the fitment catalog, sends the payment link and leaves the pick ticket ready. The team sets rules and prices and supervises. Being rolled out, no measured results yet."],["Oct 29 → 30","Purchasing: seasonal demand, reorder points and the buyer’s judgment learned from 24 months of purchases, shown next to the system’s suggestion."]],"numbers":[["364 · 30 M","tables and rows mirrored, 0 differences"],["14,213","products in one master"],["9,329","fitments with source and confidence"],["13","internal apps in 7 days"],["386 / 386","automated operations tests (Oct 30)"],["55% · 13%","sales within 15 m of the counter, proposed vs. today (simulation)"]],"honest":"Hours saved, sales won or errors avoided: no figure yet, because there is no live operation yet. What we show is what was built and tested.","hidden":"The group’s name, people, customers, suppliers, amounts and margins."},"speakercoach":{"k":"SpeakerCoach · full case","t":"Our own company, on a single system","ctx":"Our public speaking school: where the method was proven first. <b>Status:</b> in daily operation; figures measured on Oct 10, 2026.","problem":["Operations lived in half a dozen tools that didn’t talk to each other: 3,698 sales in spreadsheets, 53% with errors.","An outside implementation ran for over a year without the system reaching daily use.","The owner was the bottleneck: 24 operational emails a day, only 6% actually needed the owner."],"built":[["One system","From sale to diploma: 44 modules, almost all custom, live in about 3 months (March 2026)."],["Operations","Automatic enrollment on online payment, reminders bundled into one email per person and automatic attendance (human input overrides the automatic one)."],["AI inside","Practice-video analysis: measures pace, pauses and filler words, writes feedback for the student and a report for the coach."],["Safeguards","An email master switch, a burst detector (more than 30 emails in 15 minutes pauses sending) and cost tracking for every AI call."],["Parallel run","No function goes live without a parallel run → test → calibrate → active."],["Agent team","An agent per area prepares the work, a reviewer checks it and a person approves with a code."]],"numbers":[["44","modules in a single system"],["3,187","changes in 131 working days"],["193","scheduled automated jobs"],["60%","attendances logged by machine (1,087 of 1,823)"],["683","videos analyzed, at about US$0.12 each"],["1,777","emails sent by the system in 30 days"]],"honest":"Hours saved and attributable sales: not measured. These are scale and operations figures, not commercial results.","hidden":"Names of students, clients and team members; sales and collection amounts."}}},"heroLabels":["Inventory","Production","Purchasing","Sales","Finance","Teams"],"rotWords":["your inventory and your plant","your purchasing and sales","your planning and your team","your company’s full history"],"dl":{"what":"What it is","how":"How it works","ex":"Example","state":"Status","honest":"The honest part","check":"How to verify it","out":"What you get","src":"Figures measured in the cases, with no client names or amounts."},"details":{"lg1":{"k":"Consigliere · catalog","t":"≈90 functions across 14 modules","s":[["what","The full map of what the system can do for a tax and corporate law firm, with the data each function needs. It was designed so each fact is extracted only once: “read once, ask a thousand times.”"],["how","It starts from what the firm already has: deeds, filings, certificates of good standing, powers of attorney, balance sheets. Each function declares the fields it needs, and a single extraction schema pulls them from every document with proof: document, page and box.<ul><li>Capture and vault · live profile and graph · corporate compliance · continuous tax</li><li>Defense · planning and simulation · family wealth · memory and criteria</li><li>Lawyer’s desk · client portal · firm management · growth</li><li>AI governance · new service lines</li></ul>"],["ex","The “time machine”: who owned this company on March 3, 2019, based on what we knew on that date? The system answers with the ownership chain and the document behind it."],["state","Catalog and data dictionary complete; tested on a 100% fictional twin firm. No signed contract and no real data."]]},"lg2":{"k":"Consigliere · fictional twin","t":"150 families and 523 companies that don’t exist","s":[["what","A firm invented from top to bottom, so the system can be built and measured without seeing a single real document: privileged information never leaves the client."],["how","A generator creates the families, their companies, cross-holdings and paperwork: monthly tax returns, purchase and sales ledgers, corporate registers, meetings and matters."],["ex","The map on this page is a sample of that fictional world. Tap a family or a company to open its profile, then apply the new rule."],["state","The twin exists as structured data. The fictional PDF documents for testing document reading haven’t been made yet."]]},"lg3":{"k":"Consigliere · the test","t":"12 types of seeded anomalies","s":[["what","Errors and risks planted on purpose in the twin, with the right answer known in advance. They’re the exam: the system has to find them on its own."],["how","The engine runs rules across the portfolio: the kind of cross-checks a tax authority would run, “forgotten money,” notices with deadlines, among others. Each finding is compared with the known answer."],["ex","A new rule drops → the engine checks the entire portfolio → lists the affected companies → drafts a letter per client for the lawyer to decide on."],["honest","We don’t publish an accuracy percentage. On data that’s already structured, the result would be nearly circular; the real test is reading real documents, which hasn’t been run yet. Accuracy gets measured, not promised."]]},"gr1":{"k":"Auto group · ERP mirror","t":"364 tables and 30 million rows, without touching production","s":[["what","An exact copy of the group’s desktop ERP, an old program with no source code, so it could be analyzed without touching the system they sell with every day."],["how","The databases were restored on a separate machine and all 364 tables (30.15 million rows) were copied to analysis files. Counted table by table: zero differences. From that came a 12-month map of how money and goods move between suppliers, the three companies and customers."],["ex","The mirror revealed what the ERP doesn’t keep: 0 of 78,775 service orders carry the license plate or the vehicle, and every receipt goes to a “generic customer.”"],["state","Done on day one of the build phase (Oct 24, 2026)."]]},"gr2":{"k":"Auto group · single product master","t":"14,213 products from three companies in one master","s":[["what","One product list for the group’s three companies, which used to keep one each."],["how","The masters were merged, duplicates detected and quality measured: of 14,213 unique products, only 201 (1.4%) were truly complete (brand, manufacturer part number, photo and barcode). Recommendation: migrate 10,416, review 518, don’t migrate 3,279. Then the names of the 4,932 sellable products were reviewed one by one."],["ex","Of those 4,932 names, 3,160 ended up high-confidence, 1,720 medium and 52 low; 920 carry a question for the sales rep instead of a guess."],["state","Master and report complete. The load into the final ERP is designed, but that ERP hasn’t been contracted yet."]]},"gr3":{"k":"Auto group · fitment catalog","t":"9,329 part ↔ vehicle fitments","s":[["what","The catalog that says which part fits which vehicle, exceptions included. It’s what the counter used to do from memory."],["how","A filter manufacturer’s official catalog was loaded. Every fitment carries its source and a confidence level: A (official, verified), B (single source) or C (to be validated). When two sources contradict each other, it gets flagged, not resolved blindly."],["ex","The same make and year can take two different filters depending on the build date. The catalog keeps both options with the exception, and the counter shows the right one."],["state","7,460 fitments at level A and 1,869 at level C, pending validation."]]},"gr4":{"k":"Auto group · the build","t":"13 internal apps in 7 days","s":[["what","The tools to run the business, built on the group’s real data and tested before touching day-to-day operations."],["how","Between October 24 and 30, 2026, on top of the system (mirror, master and catalog), our team built: a counter app that searches by plate, vehicle, customer or product; an online store; a wholesale portal; digital service orders for the shop; WhatsApp with booking; customer profiles; a warehouse app with bin locations and cycle counts; a 3D warehouse and showroom; and a cloud checkout with barcoded tickets, split payments, daily cash-up, purchasing, receiving, warranties and offline mode."],["ex","A mistake-proof checkout for staff who don’t know cars: a large product photo, a scan of the physical item against the ticket, and an alert if they don’t match."],["state","386 of 386 automated tests pass. 12 apps published behind restricted access and 1 local only. Infrastructure cost for the phase: US$0, on free plans. Staff are not yet using them in daily operations."]]},"sc1":{"k":"SpeakerCoach · one system","t":"44 custom modules, from sale to diploma","s":[["what","A single management system for the whole school, replacing six tools that didn’t talk to each other."],["how","44 additional modules, almost all custom-built: about 173,000 lines of code and 100,000 of screens and templates. It went live in late March 2026, about three months after the project changed hands."],["ex","Someone pays for a course online → the system enrolls them, creates their login, welcomes them and schedules their classes. Nobody copies data from one spreadsheet to another."],["state","Before, measured during the migration: 3,698 sales in spreadsheets, 53% with errors."]]},"sc2":{"k":"SpeakerCoach · method","t":"3,187 changes in 131 working days","s":[["what","Every improvement to the system is in its history: 3,187 changes between March and October 2026."],["how","Three environments: development → staging → production. End-to-end tests run inside a transaction that is rolled back at the end. No function is switched on all at once: it first runs in parallel (it proposes without acting), then it’s tested, calibrated and only then activated."],["ex","Between October 3 and 25, 2026, 151 changes reached production."]]},"sc3":{"k":"SpeakerCoach · automation with brakes","t":"193 scheduled automated jobs","s":[["what","Work the system does on its own, on schedule: class reminders, surveys, collections and system health alerts."],["how","Reminders and schedule changes are bundled into a single email per person. And there are brakes built after real incidents: a master email switch, a “bulk-load mode,” and a burst detector that pauses everything if more than 30 emails go out in 15 minutes."],["ex","In 30 days the system sent at least 1,777 emails, and the switches stopped 568 that shouldn’t have gone out."]]},"sc4":{"k":"SpeakerCoach · work that does itself","t":"6 in 10 attendances, logged automatically","s":[["what","Two jobs that used to be manual: taking attendance and giving feedback on every practice video."],["how","Attendance is captured automatically from video-call classes and practice videos; if a person corrects it, the human entry wins. For each video, AI transcribes it, measures pace, pauses and filler words, and leaves feedback for the student and a report for the coach."],["ex","Since April, 1,087 of 1,823 attendances (60%) were logged by machine. 683 videos analyzed (23 with errors), at about US$0.12 each; 96 in 100 calls succeed."]]},"spine":{"k":"How we deploy","t":"Your company’s living system","s":[["what","One living model of the business: products, recipes, manufacturing routings, stock by warehouse, purchasing, sales, customers, suppliers, teams, conversations and history, connected to your systems and with the source of every fact."],["how","We connect to your sources with your permissions, copy what exists without touching production, merge duplicates and check anything unclear with you. On that model, a team of agents prepares each area’s work (replenishment, plant schedule, collections, team follow-up); your team reviews it and decides."],["ex","At the auto group, the system’s foundation is the mirror of their ERP (364 tables), the single master of 14,213 products and the catalog of 9,329 fitments. The counter, store, service shop, warehouse and checkout all run on it."],["out","A memory that’s yours, in your accounts, that your team can query and use every day."]]},"st1":{"k":"Stage 1","t":"Connect your sources","s":[["what","The system joins your tools the way a new hire would: with its own user and the permissions you decide."],["how","We map where your information lives: email, chats, drive, spreadsheets, ERP. At first, read-only and limited to what’s needed. Accounts and keys stay in your company’s name."],["ex","For a law firm, we prepared a read-only inventory of its document cloud, with a guide so its own admin can grant and revoke access (tested in simulation)."],["out","A map of your sources and of who can access what."]]},"st2":{"k":"Stage 2","t":"Model the business","s":[["what","Going from scattered information to one model of the business (products, recipes, routings, stock, customers and teams), with the source of every fact."],["how","We copy what exists without touching the production system, merge duplicates, measure quality and ask about anything unclear. Your team corrects and flags what is business judgment."],["ex","At the auto group, the ERP mirror (364 tables, zero differences) showed that none of 78,775 service orders carried a license plate, and that only 201 of 14,213 products were complete."],["out","An assessment with real numbers and a clean foundation for everything else."]]},"st3":{"k":"Stage 3","t":"Put it to work with your team","s":[["what","Biggest wins first: replenishing, scheduling the plant, promising real dates, reporting. Always hand in hand with your team."],["how","Every function first runs in parallel (it proposes without acting), then passes a test, gets calibrated and only then goes live. Anything going outside stays a draft until a person approves it."],["ex","At SpeakerCoach an email comes in → the system reads the thread and checks the database, calendar and meeting notes → drafts a reply with options → a reviewer checks it → a person approves with a code → it goes out from the same inbox."],["out","Tested functions, each with its own off switch."]]},"st4":{"k":"Stage 4","t":"Improves every week","s":[["what","The system doesn’t stand still: every correction from your team becomes a rule."],["how","We review results with you and fine-tune. A type of decision earns autonomy only after two weeks with 95% or more approved unchanged. Every action is logged. Support is optional and on demand."],["ex","At SpeakerCoach, a burst detector pauses sending if more than 30 emails go out in 15 minutes: it came out of a real incident and is now a rule."],["out","Your team running with the system, with everything documented in your accounts."]]},"speed":{"k":"Speed check","t":"≈ 42 hours from zero to production","s":[["what","A financial-literacy assessment portal for schools, built by our team for a nonprofit."],["how","First, its old website was migrated, with backups and redirects. Then the portal: a bank of 102 questions (30 adapted from released items, 72 original), scores per student, reports per class and school with small-group privacy, and code-based access."],["ex","The portal pilot was ready in about an hour (Oct 23, 01:13 → 02:06). From the first message to production on its own domain: about 42 hours."],["honest","Automated tests: 120 of 120. No students are using it yet: email sign-in and the legal review are still pending."]]},"tr1":{"k":"Trust","t":"We work in your own accounts","s":[["what","Systems, databases and agents are created in your company’s name: your cloud, your email, your ERP. Not on a platform of ours."],["how","Each function gets its own user, with the minimum permission needed and read-only access to start. Keys stay in your accounts. You can cut off any access from each provider’s console, without asking us."],["ex","In the architecture proposed for a law firm, everything is in the firm’s name: its database, its web layer and its connection to its document cloud, with scoped permissions."],["check","Ask for the list of access grants. Each one should show up in your own console, in your company’s name."]]},"tr2":{"k":"Trust","t":"You own your data and the system","s":[["what","Code, configuration, documentation and data stay in your accounts. If you later want to continue with another team, or on your own, you can."],["how","The code lives in a repository in your company’s name; the data in your database; the documentation in your drive. When a solution uses AI models, we recommend contracting them through a commercial API in your name."],["ex","On training: Anthropic’s commercial terms (effective June 17, 2025, checked October 30, 2026) state “Anthropic may not train models on Customer Content from Services.” With any other provider, we review its current contract before connecting data."],["check","Check your accounts: repository, database and documentation should be in your name, and so should the contract with the AI provider."]]},"tr3":{"k":"Trust","t":"Every agent action is logged","s":[["what","Every read, draft, send and change is recorded: which agent, what it did, when, and with what result."],["how","Functions write their own log; changes to the system go into the code history; every AI call goes through a log with its cost. Anything going to a customer is approved by a person."],["ex","At SpeakerCoach, every matter is logged with a code (311 in 13 days) and every change to the system is in its history (3,187 in 131 days)."],["check","Ask for the log of any given day and check one action against what actually happened."]]},"tr4":{"k":"Trust","t":"No mandatory subscriptions","s":[["what","You don’t depend on a subscription with us for the system to keep running."],["how","You pay for cloud services and AI models directly to each provider, in your own account, and you see actual usage. Support is optional and on demand. There are no exit fees."],["ex","Infrastructure for the auto group’s build phase cost US$0, on free plans. At SpeakerCoach, the AI inside the system cost US$96 for all of September 2026."],["check","Cloud and AI invoices go to your company, not to us."]]}},"terms":{"tecnopoiesis":"Technopoiesis™ is the system’s ability to detect its own flaws, fix them and improve its infrastructure: it sees the pattern in the data, proposes the rule change, tests it in a separate environment and leaves it ready. A person on your team approves before it goes into production.","columna":"The living system is one model of your business: products, recipes, routings, stock, customers, suppliers, teams and history, connected to your systems. The whole operation is run from there, alongside your team.","agente":"An agent is an AI program with a defined role and limited permissions: it reads, prepares and executes one area’s tasks (purchasing, for example) and leaves anything important for a person to approve.","constelacion":"Agents work on the living system, one per area: purchasing, production, sales, finance, teams. They share the same business model, coordinate with each other and improve with every correction from your team.","modelo":"Modeling means building a living map of your company: products, recipes (bills of materials), manufacturing routings, warehouses, customers, suppliers, processes and rules, connected to your real data.","gemelo":"A digital twin is a virtual copy of something physical, like your warehouse, kept up to date with your data. It lets you see and test changes before making them."},"day":[{"t":7,"time":"07:00","agentKey":"gen","agent":"General","title":"Your morning brief is ready","sub":"Yesterday’s margin, the constraint’s status and three alerts.","body":"<h4>Good morning. Here is what you need to know today</h4><ul><li><b>Yesterday:</b> the line 2 disperser, the constraint, ran 7.5 of 8 hours. The rest of the plant kept pace.</li><li><b>This week:</b> the constraint has more order hours than available hours; a new sequence is proposed.</li><li><b>Alert:</b> titanium dioxide entered the red zone; without a purchase today, the disperser stops.</li></ul><p class=\"m-dec\"><b>To decide today:</b> approve the disperser sequence and the suggested purchase order.</p>"},{"t":7.7,"time":"07:40","agentKey":"mail","agent":"Inbound","title":"Overnight orders and email, sorted","sub":"Customer orders loaded as drafts; urgent items first.","body":"<h4>What came in overnight</h4><ul><li><b>Orders:</b> two customer purchase orders became draft sales orders, dated by the plant’s real capacity.</li><li><b>Urgent:</b> a customer needs a quality certificate; it became a task for the lab.</li><li><b>Suppliers:</b> a shipping confirmation and an invoice went to Purchasing and Finance.</li></ul><p class=\"m-dec\">Nothing is confirmed to a customer without approval.</p>"},{"t":8.25,"time":"08:15","agentKey":"ops","agent":"Production","title":"Constraint sequence proposed","sub":"Light to dark, with a 4-hour reserve.","body":"<h4>Disperser schedule · line 2</h4><p>Running batches from light to dark cuts cleaning hours, and a 4-hour reserve of ready work keeps the constraint from waiting for material. Three committed orders are back on time.</p><p class=\"m-dec\">The plant manager approves or adjusts before the shift.</p>"},{"t":9.5,"time":"09:30","agentKey":"ops","agent":"Purchasing","title":"Replenishment by real consumption","sub":"7 inputs in the red zone; draft orders ready.","body":"<h4>Raw material safety stock</h4><p>Seven inputs entered the red zone. We replenish what was consumed, not what a forecast said. Three solvent orders in the green zone are proposed for postponement.</p><p class=\"m-dec\"><b>Suggestion:</b> 7 draft purchase orders. Approve or adjust.</p>"},{"t":11,"time":"11:00","agentKey":"fin","agent":"Finance","title":"Invoice doesn’t match the PO","sub":"Price difference flagged for review.","body":"<h4>Supplier invoice review</h4><p>The invoice charges a different unit price than the approved purchase order. Every other line matches the order and the warehouse receipt.</p><p class=\"m-dec\">On hold, with an email to the supplier drafted to request a credit note.</p>"},{"t":12.5,"time":"12:30","agentKey":"chat","agent":"Team","title":"Batches waiting for quality","sub":"14 batches not released; proposal to the supervisor.","body":"<h4>Supervision</h4><p>14 batches are waiting for quality control, five of them from the constraint. The afternoon shift has a single analyst. The system writes to the supervisor with the details and reminds the lab of two customer commitments.</p><p class=\"m-dec\">Proposal: release the constraint’s batches first and reinforce the afternoon shift. The supervisor decides.</p>"},{"t":14,"time":"14:00","agentKey":"sales","agent":"Sales","title":"Delivery dates based on real capacity","sub":"Quotes that promise what the plant can deliver.","body":"<h4>Quote with a real date</h4><p>Before promising, the system checks the constraint’s load and input stock. If the requested date isn’t feasible, it proposes the earliest possible date or an alternative already in stock.</p><p class=\"m-dec\">The rep checks price and terms, and sends it.</p>"},{"t":16,"time":"16:00","agentKey":"ops","agent":"Inventory","title":"Stock that doesn’t move","sub":"Batches about to expire and unused raw materials.","body":"<h4>Obsolescence</h4><ul><li>Finished-goods batches that expire before they can sell at the current pace.</li><li>Raw materials from discontinued formulas, with the lab test to reuse them.</li><li>Custom orders made and never picked up.</li></ul><p class=\"m-dec\">Each case with its plan: reformulate, clear or invoice. Operations decides.</p>"},{"t":17.5,"time":"17:30","agentKey":"gen","agent":"General","title":"Production meeting summarized","sub":"Decisions, owners and dates on the calendar.","body":"<h4>Meeting notes</h4><ul><li>Decision: schedule the disperser light to dark starting tomorrow.</li><li>Task: change the primer recipe to use the slow-moving resin (lab, Thursday).</li><li>Task: review filling overtime (supervisor, Friday).</li></ul>"},{"t":19,"time":"19:00","agentKey":"gen","agent":"General","title":"End-of-day wrap-up","sub":"What got done, what’s pending, what to decide tomorrow.","body":"<h4>Wrap-up</h4><p>What was done today, what is waiting for approval and tomorrow’s three decisions, ranked by impact on margin.</p><p class=\"m-dec\">The night shift carries on; stock moves and timesheets keep flowing into the system.</p>"}],"legalCase":{"law":"New regulation (example): changes how withdrawals from holding companies are treated","hitTitle":"Who it affects","hitText":"{n} companies across {f} families are affected. Draft letters are ready for the lawyer to review.","letterTitle":"Draft letter to the client","letter":"Dear client: we are writing because a newly published regulation changes how withdrawals are treated in holding companies such as {soc}. We have reviewed your structure and suggest meeting to go over alternatives before the next close.","kinds":{"fam":"Family group","per":"Person","soc":"Company"},"socKinds":{"inv":"Holding","op":"Operating","inm":"Real estate"},"fields":{"kind":"Type","owner":"Owners","owns":"Holds stakes in","status":"Status","ok":"No change","hit":"Affected by the new rule"}},"warehouse":{"rack":"Rack","level":"Level","sku":"Product code","rot":"Turnover","rotLv":["Low","Medium","High"],"cats":["Oil filters","Brake pads","Bulbs","Fasteners","Paint","Hand tools","Belts","Batteries","Lubricants","Wiper blades"],"note":"Fictional data. In the real case, every box comes from inventory and sales.","optDone":"Fast movers are now next to the counter. In the simulation of the real case (some measurements assumed), this layout puts 55% of sales within 15 m of the counter, versus 13% without it."},"org":{"human":{"t":"Leadership (human)","d":"Sets priorities, approves anything sensitive and signs. Gets a daily summary and only the decisions that are theirs to make."},"general":{"t":"General agent","d":"Coordinates the other agents, routes requests between areas and prepares the daily summary for leadership."},"mkt":{"t":"Marketing agent","d":"Prepares posts, campaigns and assets, always as drafts to approve."},"com":{"t":"Sales agent","d":"Answers inquiries, drafts proposals for companies and follows up."},"ops":{"t":"Operations agent","d":"Groups, schedules, make-up classes and diplomas, following the team’s rules."},"fin":{"t":"Finance agent","d":"Receipts, reconciliation, pending payments and bookkeeping."},"pla":{"t":"Platform agent","d":"Improves the internal system: takes requests from other areas and tests them before release."},"feed":[["mkt","Post draft ready for approval"],["com","Corporate proposal drafted"],["ops","Make-up class booked with real capacity"],["fin","Payment reconciled, receipt queued for review"],["pla","Improvement tested in staging"],["general","Sales request routed to Platform"],["com","Follow-up sent on last week’s inquiry"],["mkt","Content ideas from the latest class"],["fin","Supplier invoice classified"],["ops","Attendance list updated"],["general","Daily summary sent to leadership"]],"decide":"What a person decides","decides":{"human":"Anything sensitive","general":"Priorities across areas","mkt":"What gets published","com":"Price and terms","ops":"Exceptions","fin":"Payments and issuing","pla":"Release to production"}},"feats":[{"t":"Answers with sources","d":"Recording of this page’s “Ask Poesi” demo with a fictitious manufacturer: the owner asks, the system reviews stock moves, production orders, purchasing, sales and timesheets, answers with every source cited and leaves a draft ready for someone on the team to approve. It’s a scripted demo."},{"t":"Turns what comes in into operations","d":"Orders and inquiries arrive by email, chat or portal. The agent reads them with the customer’s history and turns them into draft sales orders, dated by what the plant can deliver given the constraint’s load and input stock. Your team reviews and confirms."},{"t":"Models your entire business","d":"Products, recipes or bills of materials, manufacturing routings, warehouses, customers and suppliers become one living model. The agent reads spreadsheets, exports and old systems, merges duplicates, fixes the obvious and asks about the doubtful. Everything else runs on that model."},{"t":"Replenishes by real consumption","d":"Each input has its own safety stock, sized from real consumption and the supplier’s lead time. When it hits the red zone, the agent drafts a purchase order for what was used; when there is too much, it proposes waiting. No stock-outs, and no extra capital tied up."},{"t":"Talks to your team","d":"The system writes to the supervisor and to each person: it reminds them of tasks, flags orders running late, proposes how to spread the load and drafts the emails to customers and suppliers for someone to review and send."},{"t":"Applies a new rule across the portfolio","d":"Recording of the Consigliere demo with 100% fictional data: a new regulation drops, the system checks it against every family and company in the firm, shows who is affected and drafts a letter per client for the lawyer to decide on."},{"t":"One agent per area, with your team","d":"SpeakerCoach’s org chart: human leadership, a general agent that coordinates, and one agent per area (marketing, sales, operations, finance, platform), all on the same system. The feed shows what they prepare; anything sensitive is approved by a person."},{"t":"Briefs the owner","d":"Every morning, one screen: how the bottleneck did, the margin the plant made, capital in stock that isn’t moving, late orders and what you need to decide today. No need to open five systems."},{"t":"Models your operation, even in 3D","d":"Fly-through of a warehouse digital twin (fictional data): turnover heat map and re-slotting fast movers next to dispatch. In the real case it was built from 23 photos, a hand-drawn sketch and measurements dictated by voice."}],"loops":{"mail":{"rows":[["Industrial customer","PO 4471 · 2,000 L of AC-15"],["Distributor","Date for 600 pails?"],["Pigment supplier","Shipment confirmed"],["Mining customer","Quality certificate"],["Portal","Replenishment order"]],"re":"Sales order SO-5520 · draft","draft":"2,000 L of AC-15 for the industrial customer. Feasible delivery: Nov 18, given the disperser’s load and input stock."},"quote":{"k":"Real consumption · 3 weeks","ask":"7 inputs below their safety stock. Titanium dioxide: 10 days of stock.","title":"Purchase order · draft","rows":["Titanium dioxide × 8,400 kg","20 L pail × 1,200","Acrylic resin × 3,000 kg"],"stock":"by consumption","total":"Total"},"chat":{"q1":"Today: 14 batches wait for quality; 5 are from the constraint.","a1":"Who can cover the afternoon?","q2":"One morning analyst. I left the change proposed.","a2":"Good, approved."},"report":{"title":"Good morning","l1":"Constraint: 7.5 of 8 hours yesterday","l2":"Slow-moving stock: plan ready","l3":"3 orders at risk: new sequence"}},"pills":{"mail":"Order drafted","data":"Living model","quote":"Ready to approve","report":"07:00 · Owner brief"},"videoNote":"Illustrative animation with sample data.","formSoon":"Coming soon. This form is still a prototype and does not send any data."}